Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1390 of 1390

There needs to be a better way to understand the relationships between elements and reference files that are created by snap rules and constraints.

This improvement would use graphic symbols (construction elements) to represent constraint relationships in plan view. For horizontal elements that are snapped, there are the snap glyphs that show that there is a relationship, but there is not a w...
about 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

aerial transparency

When utilizing plan over plan sheets, the top aerial responds to transparency set in the design model, but the bottom one does not. Please reference the discussion on this Bentley forum. https://communities.bentley.com/products/road___site_design/...
over 1 year ago in Drawing Production 0

Delete Circle Associated with Civil Labeler when Civil Labeler Text Deleted

Civil Labels can get dissassociated for a number of reasons. When this happens, the user often deletes the text that turns dashed. This, however, does not delete the circle associated with the text. Due to this, the remnant circle is left. This ca...
about 2 years ago in Annotation 2 Future consideration

Civil Labeler - multiple intersection points

I want to create a label that will be placed at the intersection of a corridor line and several drawn pattern lines. However, the Intersection placement method only allows for one selection and one other selection. You can't use a selection set. W...
over 1 year ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Add profile annotation location option for annotating conduit description only once

If a conduit is perfectly straight, then it is easy to put the description once in the middle, but if the conduit has any bends then each segment gets annotated. Adding an option for annotation frequency with location controls would fix this.
almost 2 years ago in Annotation / Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Separate geometric ratios summary from stress ratio summary

OpenBridge LEAP Steel Summaries include geometric ratios (like 6.10.7.3-1) together with stress ratios. This is not helpful, as that ratios is not a real demand/capacity ratio, therefore when that geometric value of "performance ratio" is high, it...
4 months ago in OpenBridge Designer / Reports 0 Future consideration

Export Civil Report to csv

We're using ORD version 2023, and the Civil Reports browser allows us the option to export to xml, html, doc, and xlsx file formats. We used to have a function that allowed us to save as a txt file, which we could change the extension to csv so it...
7 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Reports 0 Future consideration

Pile Embed Length Manual Override

A standard Pier type used in our state typically calls out two lengths of pile ('Long' and Short') that alternate along the width of the Substructure. An example plan is attached. If the ' Embed Length ' variable had a manual override option to ch...
7 months ago in OpenBridge Modeler 0 Future consideration

Enhancement Geometry Builder

Enhancement Geometry Builder to get the point description so that it can be used for legal description reports. Geomerty builder is quicker workflow then building pieces and complexing them together plus it allows saving the parcels.
over 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Formulas for Rail Information included in Help Documentation

The formulas utilized in OpenRail are not properly documented within the Help Information. Several Examples include CANT. The Equilibrium Constant gives no useful information in the help documentation for understanding WHAT THIS VALUE IS. As a des...
over 1 year ago in Help and Documentation / OpenRail Designer 0 Future consideration