Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

OpenBridge Designer

Showing 24

Allow LFD substructure analysis with an LRFD Superstructure in LEAP Steel

When performing a superstructure replacement, it is common to design the proposed superstructure in LRFD but then analyze the existing substructure capacity in LFD. Currently with LEAP Steel, because the superstructure was designed in LRFD the sub...
over 1 year ago in OpenBridge Designer 0 Needs review

[RM Bridge] Enable right-click menu for the side graphic window when the main graphic windows do not show the model

This is a feature request for RM Bridge 1. When the main graphic windows show the model, the right-click menu is enabled for the the side graphic window Please refer to attached 1.png. 2. But when the main graphic windows does NOT show the model, ...
almost 2 years ago in OpenBridge Designer / User Interface 0 Needs review

Allow member groups to start and stop at the same support line in LBS

We are modeling a complex bridge in LBS and the bridge is flared. The flare has required the addition of shorter beams that are not full length to keep the beam spacing on the flared end reasonable. Currently LBS does not allow more than one beam ...
almost 2 years ago in Modeling / OpenBridge Designer / OpenBridge Modeler 0 Needs review

Implement Beam hog modeling aligned to Australian Bridge design

Current Beam hog modeling is not as expected for Australian Bridges. Deck thickening can be applied, but the beams that support the deck do not follow the underside shape of the deck. The beams are straight, but really need to be curved and follow...
about 2 years ago in OpenBridge Designer / OpenBridge Modeler 0 Needs review