CTDOT would like the ability to create event points from Drainage Nodes. Many of our projects have a lot structures and manually adding event Points at each crossing is tedious. Projecting drainage on XSCs still does not work like we need it to, s...
Trim with Connection Points/Regions on opposite sides of cell
I would like to have the ability to put connection regions and connection points on opposite ends of cells, specifically aprons. Currently, the apron won't trim with this setup.
Add Offset Format options to the Baseline Offset Text Favorite
Add the Offset Format options that are available for the Point Offset text favorite (Positive Prefix, Negative Prefix, Positive Suffix, Negative Suffix, and Show Sign) to the Drainage Baseline Offset text favorite.
Add shear stress calculation (based on HEC-15) to conduit data.
Conduit data has flow data but not shear force data which would help design the channel lining needed to protect from ditch/channel erosion. https://www.fhwa.dot.gov/engineering/hydraulics/pubs/05114/05114.pdf
Allow manual input of acre area when manually defining a catchments subareas
Currently when manually defining a catchments subareas we are only able to hard code in a percentage of the total drainage area instead of the acreage of that subarea (see attached file). This causes us to have to manually calculate the percentage...
Placement Point for design and baseline Station/offset
The optimal placement point for design of drainage nodes not always the preferred callout point for construction. The request is to be able to have an additional "Construction" layout point to get station and offset reports that are different than...